  J.R. Lynch & Sons-Muddy Creek and Archie Elledge WWTPs Phase II Rehab Project

ADD TO YOUR CALENDAR: Download as iCal file

 

   

WHEN:

  Tuesday, March 20, 2018

WHERE:

  Winston-Salem, NC  (more detail)

CATEGOR(IES):

  Bid Opportunities

DESCRIPTION

Jimmy R. Lynch & Sons, Inc. An Equal Employment Opportunity Contractor, Will Consider All Quotes Regardless of Race, Color, Religion, Sex, or National Origin and is Soliciting Bids for MBE/WBE Participation.
Project Name:  Winston-Salem (Forsyth County) Muddy Creek and Archie Elledge WWTPs Phase II Rehabilitation Project
 
Project Date:  Bids:  3-20-18 @ 2:00 PM
 
** Please Submit Quote the Day Prior to Bid Opening    Phone:  336-368-4047    Fax:  336-368-4613
** Please provide your proposal by:  3-19-18 by fax or email to This email address is being protected from spambots. You need JavaScript enabled to view it. orThis email address is being protected from spambots. You need JavaScript enabled to view it.
Work May Include, But not Limited To:   Materials, Staking & Surveying, Seeding, Mulching,  Interior & Exterior Piping & Valves, Water, Sewer, Earthwork, Electrical, Switchgear, Instrumentation & all Mechanical & Electrical Appurtenances, Pump Station, Hauling, Clearing & Grubbing, Erosion Control, Precast Concrete Structures, Thermal & Moisture Protection, Finishes,  Painting, Cast-in-Place Concrete Construction, Rebar Tying  & Other Incidental Items Necessary For Construction to complete the project.
Thescopeofworkcoverstwofacilities:TheArchieElledgeWWTPandtheMuddyCreekWWTP. Work at the Muddy Creek WWTP includes, but is not limitedto:
Aeration System Upgrades
         Five aeration blowers equipped with an automatic dissolved oxygen controlsystem;
         New process air piping, valves, and air flow meters for the three existing aeration basins in conjunctionwithmodificationstoexistingaerationpipingassociatedtheexistingBlowerBuilding;
         Replacement of existing membranes for the diffused aeration system for the three existing aeration basins;                                                                       ·
         Construction of a new electrical room within the existing BlowerBuilding;
         Associated site work and electricalwork.
Thickening Facilities Upgrade
         Installation of new gravity thickener drive mechanism andappurtenances;
         Two new adjustable frequency driven thickened waste activated sludge pumps with associated piping andvalves;
         New polymer kedsystem;
         Construction of new electrical room within the existing thickeningbuilding;
         HVAC and plumbingimprovements;
         Associated site work and electricalwork.
Digester Improvements
         Six new sludge recirculation pumps;
         Six new sludge transferpumps;
         Modifications to the two existing primary heatexchangers;
         Upgrade to the existing boilercontrols;
         Two new plant hot water loop pumps and three heating waterpumps;
         New compressed airsystem;
         Modifications to the existing standby generatorradiator;
         Replacement of valves and flow meters.
Work at the Archie Elledge WWTP includes, but is not limited to: Thickening Facility Upgrades
         Construction of a new waste activated sludge pumping station with three submersible screw centrifugal pumps equipped with adjustable frequencydrives;
         Refurbishment of two existing gravity beltthickeners;
         One new gravity beltthicker;
         New polymer feed system and bulk storagetank;
         New electrical room within the existing Gravity Belt ThickenerBuilding;
         Modifications to the existing piping and valves to accommodate newwork;
         Modifications to the existing odor control scrubber andpiping;
         Modifications to existing wet-well and installation of two new submersible filtratepumps;
         Associated site work and electricalwork.
Primary clarifier Effluent Level Control Structure
         Construction of a new Level Control Structure for the Primary Clarifiers with associated level transmitters, piping andvalves;
         Associated site work and electricalwork.
PleasecontactDanielLynch (Vice President of Engineering) at This email address is being protected from spambots. You need JavaScript enabled to view it. ';document.getElementById('cloak7ee86343651f6a528c831b322e843683').innerHTML += ''+addy_text7ee86343651f6a528c831b322e843683+'<\/a>'; for a linktotheprojectdocuments. (336-368-4047)Additionally,projectdocumentsareavailableforviewing atourofficelocated at307SAcademy St.,PilotMountain,NC27041.
You may view plans & specs at the following locations:   All work will be in accordance with the Plans and Specifications which are on file in the office of the
1)     City/County Purchasing Department, Room 324, City Hall Building, 101 North Main Street, Winston-Salem, North Carolina, (336)727-2983;
2)     Construct Connect, 2825 Edwards Road, Suite 800, Cincinnati, Ohio 45209,  800-364-2059 x8221;
3)     Black&VeatchfuternationalCompany,10715DavidTaylorDriver,Suite240,Charlotte,NC28562, (704)548-8461;
4)     Black&VeatchfuternationalCompany,11000RegencyParkway,Suite410,Cary,NC27518,(919) 462-7501.
Bonding:
ItisJimmyR.Lynch&Sons,Inc.policyNOTto requireM/WBEsubcontractorsto providebonding toJimmyR.Lynch&Sons,Inc.fortheirportion ofthework.AllM/WBEsubcontractorswillbeallowed toworkunderJimmyR.Lynch&Sons,IncPerformance&PaymentBondstotheOwner.
FinancialAssistance:
JimmyR.Lynch&Sons,Inc.willprovideJointCheckAgreementsto allM/WBEsubcontractors.PleaserequestaJointCheckagreementin writing ifneededand JimmyR.Lynch&Sons,Inc.willworkwith youand thematerialvendortodevelop JointCheckAgreementtosatisfy allparties.
QuickPayments:
ItisJimmyR.Lynch&Sons,Inc.policytoprovideQuickPaymentsifneeded toallM/WBEsubcontractors.Jimmy Lynch &Sons,Incwillprovidepaymentto allM/WBEsubcontractors onaweekly or monthly basisiftheworkforwhich paymentisbeing requested iscompleteand accepted bytheCityofWinston-Salem
JRL encourages 2nd tier MBE/WBE/DBE Subcontracting opportunities.  We encourage our subcontractors to utilize 2nd and 3rd tier MBE/WBE/DBE Subcontractors. 

 

LOCATION

VENUE:

  Winston-Salem, NC

ADDRESS:

 

CITY:

  Winston-Salem

STATE:

  NC

ZIP:

 

Share this event with your friends on Facebook:  

crcnc logo 2012transparent

ncdot transparent

Construction Resource Centers of North Carolina are a partnership project of the Institute and N.C. Department of Transportation

Ensuring Access
and Opportunity in
North Carolina